Study Plan DocumentThe Integrated Licensing Process (ILP) requires Douglas PUD to
propose a detailed study plan document, which will include multiple proposed
studies, within six months of filing the
Notice of Intent (NOI) and
Pre-Application Document (PAD). The study plan
document must contain specific
information about each study and include timelines and reporting
procedures. Douglas PUD's Revised Study Plan Document was filed with FERC on September 14, 2007.
|